| Power
cost |
| CATEGORIES
|
SPECIFICATIONS
|
Charge
standards |
| Residential lighting |
1)less than 1 KV |
? Rmb 0.403/Kwh |
| 2)over 1 KV |
?Rmb 0.373/Kwh |
| Commercial and Non-residential Lighting |
1)less than 1 KV |
Rmb 0.739/Kwh |
| 2)over 1 KV |
Rmb 0.579/Kwh |
| Non-common industrial use (non-industrial use
and common industrial use) |
1)less than 1 KV |
Rmb 0.533/Kwh |
| 2)1-10 KV |
Rmb 0.543/Kwh |
| 3)over 35 KV |
Rmb 0.533/Kwh |
| Large Scale Industrial Use |
Basic charge as per transformer Max. demand to special enterprise
|
Rmb12/KVA/month
Rmb 18/KWh/month |
| POWER CONSUMPTION CHARGE |
|
| 1)1-10 KV |
Rmb 0.381/Kwh |
| 2)35 KV |
Rmb 0.371/Kwh |
| 3)110 KV |
Rmb 0.361/Kwh |
| Sub-charge for electric power of erecting power
transmission lines engineering (re-networking fund) |
380V/220V |
Rmb 550/Kwh |
| 10 KV |
Rmb 450/Kwh |
| 35 KV |
Rmb 330/Kwh |
| 110 KV |
Rmb 180/Kwh |
| Sub-charge for electric power engineering of laying
cables |
380KV/220V |
Rmb 1100/Kwh |
| 10 KV |
Rmb 900/Kwh |
| 35 KV |
Rmb 800/Kwh |
| 110 KV |
Rmb 400/Kwh |
|
| |
| Heat
Supply Charge |
| Categories
|
Charging
Standard |
| Industrial Use (for production purpose) |
Rmb 103/ton |
| Heating Use |
Factory Building |
Rmb 103/ton |
| Office Building |
Rmb 19.5/m2 |
| Residential Building |
Rmb 13.5/m2 |
| Business Use |
Rmb 25/m2 |
| Facility fee |
180000/ton |
|
| |
| Tab
Water Charge |
| Categories |
Charge
Standard |
| Industry Use |
Rmb 2.55/ton |
| Residential Use |
Rmb 1.2/ton |
| Institute Use |
Rmb 1.5/ton |
| Service Business |
Rmb 10/ton |
| Washing |
Rmb 15/ton |
|
| |
| Telecommunications
Charge |
| Types
of Business |
Standard
of Charges (RMB) |
| Installing Charge |
Basic Monthly Rent |
| Telephone |
|
Rmb 30(enterprise) |
| Rmb 18(resident) |
| Facsimile |
Rmb 300 |
|
| CHINANET |
Rmb 50-100 (opening fee) |
Rmb 4/hour (within 1-60 hours) |
| CHINAPAD |
|
Installing charge for special line Rmb 2600/unit |
Testing fee for switching network
Rmb 1000/unit (synchronous)
Rmb 400/unit (asynchronous) |
| Material cost: Rmb 158/unit |
| DDN |
|
Charge of commissioning urban special line: Rmb 200/unit |
|
| |
| Site-use Price |
| (1)land leasing price |
Catalogue |
Industrial |
Commerce &trade, office
building |
Real estate |
Basic price |
Facility fee |
Basic price |
Facility fee |
Basic price |
Facility fee |
In RMB/per mu |
200,000 |
200,000 |
300,000 -350,000 |
100,000 |
100,000 |
Duration (year) |
50 |
50 |
70 |
|
For information 1 mu=674.5 square meters
15 mu=1 ha
Different preferential prices are given according to the type of projects,
source of the investments, technological contents and geographical
location. The land should be available from plain land to the condition
of road, water supply, electricity power, heat supply, drainage, natural
gas supply, industrial steam supply and telecommunication
.
(2)Land-leading Rate for Standard buildings and office buildings
The price for standard buildings and office building is confirmed
from Rmb 19-21 square meter according to the stories available, public
facilities, communication condition and payment form and so on. |
| |
| Labor Service Charge |
| Item |
Standard and Proportion
|
Payment |
| Total Wages/salary |
Not less than 120% of the average wages of the employees of
state-owned enterprise of the same trade in Baoding City |
Issue directly to employees in currency |
| Welfare Treatment during Employment |
According to the provision of the state, province and city
on labor, insurance and welfare benefits for the employees in
state-owned enterprises. |
Drawn out or actually disbursed according to the specified
proportion |
| Old-age pension |
20% of the total payment made by enterprises; 4% of the total
payment of each employee made by employee himself. |
Paid every month by enterprise to Baoding High-tech zone branch
of social Labor &Insurance Institute |
| Unemployment insurance funds |
2% of the total payment made by enterprises; 1%of the total
payment of each employee made by employee himself. |
Paid every month by enterprise to Baoding High-tech zone branch
of social Labor & Insurance Institute |
| Industrial accident Insurance |
Payable by the enterprise equivalent to 0.4% of the total
wages of employees. |
Paid every month by enterprise to Baoding High-tech zone branch
of social Labor &Insurance Institute |
| Child-bearing Insurance funds |
Payable by the enterprise, equivalent to 0.9% of the total
wages of employees. |
Paid every month by enterprise to Baoding High-tech zone branch
of social Labor &Insurance Institute |
| Medical Benefit Funds |
Rmb 8 paid by each stuff worker every month.
Rmb 4 paid by each retired worker every month |
Paid every month by enterprise to Baoding High-tech zone branch
of social Labor &Insurance Institute |
| Housing accumulation Funds |
10% of the total individual wages of staff and workers paid
by staff workers themselves and their working units respectively.
|
Paid every month by enterprise to the management center of
Housing Funds Baoding City |
|
| |
| Wastewater Discharge Charge |
Wastewater discharged in conformity with national sanitation
provision will be charged by RMB 0.15 per ton, and the wastewater
over standard but allowed to discharge will be charged additionally
by RMB 0.05 per ton.
Building
Requirements
1) Fleer Area Index
Factory: 0.8-1
Residence:¡Ü1.5
Office and Commerce:1.5-2.5
2) Building Density¡Ü35%
3) Green Area Index¡İ30%
4) Height: Main buildings on the both sides
along main roads are allowed to be more than 5 stories
5) Distance form the building ¡°red line¡± to
the road ¡° red line¡±
15 m for main trunk roads, 6-10m for common roads
6) Enclosed walls
Fencing or railings may be built up in factory areas.
7) Earthquake intensity:7 degrees on the Richter
Scale
Standards
of Environment Protection
Discharge of Industrial Wastewater
Following ¡±Integrated Wastewater Discharge Standard¡±(GB8978-1996)
of the People¡¯s Republic of China
.
Emission of Waster Gas, Smoke and Dust
Emission of air pollutants such as waste gas, smoke shall follow
¡°Integrated Emission Standard of air Pollutants¡±(GB16297-1996) of
the People¡¯s Republic of China.
Noise control
Noise from industrial enterprise shall follow ¡°Standard of Noise
at Boundary of Industrial Enterprises¡±(GB12348-90) of the People¡¯s
Republic of China.
Noise from construction sites shall follow ¡°shtandard of Noise at